Free roof waste calculator
Roof waste calculator: how much extra shingle to order
Choose a waste factor for the roof's shape and see the squares and bundles to order, how many extra bundles the waste allowance adds, and what it costs.
Live calculation
Roof waste result
- Measured squares
- 28.46
- Squares with waste
- 31.88
- Bundles to order
- 96
- Bundles without waste
- 86
- Extra bundles for waste
- 10
Planning estimate only. Verify field measurements, product coverage, bundle packaging, waste, starter, ridge cap, local code, and manufacturer instructions before purchasing.
Worked example
A 2,846 sq ft hip roof is 28.46 squares. With a 12% waste factor that becomes 28.46 × 1.12 = 31.88 squares, and at 3 bundles per square 95.6 bundles: order 96. Without waste it would be 86 bundles, so the allowance adds 10 bundles. At 10% the order is 94 bundles; at 15% it is 99.
Why roofs waste shingles
Every place a course of shingles has to be cut, part of the shingle is thrown away. Hips and valleys force a diagonal cut on every course they cross, dormers and skylights add short runs, and the last shingle in each course is trimmed at the rake. A plain gable has few of those cuts; a roof with several hips, valleys and dormers has many.
Too little waste means a second delivery and mismatched shingle lots. Too much means paying for bundles that go back to the supplier, if they take returns at all. The waste factor is a judgment call, so write down the one you used in the estimate.
| Waste factor | Squares with waste | Bundles |
|---|---|---|
| 0% | 10 | 30 |
| 10% | 11 | 33 |
| 12% | 11.2 | 33.6 → 34 |
| 15% | 11.5 | 34.5 → 35 |
| 20% | 12 | 36 |
Roofing contractors
Measure the roof, then let the quantities follow.
Trace roofs on aerial imagery and carry squares, edges and pitch straight into estimates and proposals. Every paid plan includes unlimited self-service roof measurements.
See the measurement softwareJust one property
Need a measured roof, not another calculation?
Order a $19 human-reviewed residential roof measurement report. Typical turnaround is about one working hour for straightforward homes with usable imagery.
Order a reportQuestions
What is a normal waste factor for shingles?
About 10% for a simple gable roof, rising toward 15% for hip roofs and roofs with several valleys or dormers. Very cut-up roofs can need more; measure them carefully rather than guessing high.
Do I add waste before or after rounding bundles?
Before. Multiply measured squares by the waste factor, convert to bundles, then round up once. Rounding squares first and then adding waste over-orders.
Does waste apply to ridge cap and starter?
They get their own, smaller allowances because they are ordered by linear feet of ridge, hip, eave and rake rather than by area.